Planning report
Planning near BT42 4AG
Planning permissions and roadworks near BT42 4AG
Planning applications
- planning3 Jun 2024237 m
Planning application: Lands at 24 Crebilly Road, Ballymena, BT42 4DN
Full Local Proposed housing development comprising 48 residential units, associated internal road network, public open space, landscaping, parking, access and ancillary site works. Authority: Mid and East Antrim. Status: Pending.
Northern Ireland Planning Statistics
- planning11 Sep 2024441 m
Planning application: Lands at the St Patrick's Regeneration site, adjacent and south of Demesne Avenue, approximately 100m to the north east of Castle Tower School, St Patricks Link, Ballymena, BT43 7FT
Full Major New leisure, health and wellbeing centre to include 8-lane pool, learner pool, 4 court sports hall, café, gym, spin studios, clip and climb, community hub, soft play area and spa facility. Access to be provided via Demesne Avenue, with external facilities including outdoor workout area, car parking, dedicated bus parking and lay-by, cycle stands, landscaping, substation, and all associated works. Authority: Mid and East Antrim. Status: Pending.
Northern Ireland Planning Statistics
- planning28 Mar 2024435 m
Planning application: Castle Tower School, 50 Larne Road Link, Ballymena, BT42 3GA
Full Local Extension to the existing Castle Tower School to include 3 no. new classrooms, external store and hygiene room and associated works. Alteration to internal roads layout. Authority: Mid and East Antrim. Status: Approved. Decision: Approved.
Northern Ireland Planning Statistics
- planning14 Jun 2024466 m
Planning application: 213 Orkney Drive, Ballymena, BT42 4ES
Full Local Ground floor side/rear extension for bedroom & shower room and level access ramp at front of house Authority: Mid and East Antrim. Status: Approved. Decision: Approved.
Northern Ireland Planning Statistics
- planning31 May 2024568 m
Planning application: Lands at the St Patrick’s Regeneration site located off Demesne Avenue, extending north-east across Braid River, approximately 145 metres to the west of the Ecos Hub, Ballymena, BT43 7QA.
Full Major St Patrick’s Regeneration Community Connections project – comprising public realm interventions; new pedestrian and cycle bridge spanning the Braid River connecting to the Ecos Nature Park; new outdoor event space; new sensory garden with central sculpture; new mobility hub including Changing Places room and cycle parking; and all associated works. Authority: Mid and East Antrim. Status: Pending.
Northern Ireland Planning Statistics
- planning26 Mar 2025595 m
Planning application: 2 KNOCKEEN CRESCENT BALLYKEEL BALLYMENA BT42 4DQ
Full Local Single storey rear extension to dwelling Authority: Mid and East Antrim. Status: Pending.
Northern Ireland Planning Statistics
- planning22 Nov 2024651 m
Planning application: 24 Knockeen Crescent, Ballymena
Full Local Demolish existing garage and construct new garage at gable of main dwelling with utility room and WC at rear. Above garage to provide new master bedroom with en-suite. Authority: Mid and East Antrim. Status: Approved. Decision: Approved.
Northern Ireland Planning Statistics
- planning15 Feb 2024699 m
Planning application: 30 CASEMENT STREET BALLYKEEL BALLYMENA BT42 4BY
Full Local Change of use from dwelling to a house of multiple occupation Authority: Mid and East Antrim. Status: Withdrawn. Decision: Withdrawn.
Northern Ireland Planning Statistics
Roadworks and street disruption
- roadworks21 Apr 20261.4 km
Lane Closure on Galgorm Road, Ballymena
Lane Closure required for BT cabling works . Work will only take place from 07:00 am on Saturdays to 06:00 Monday over 4 weekends. Closure to operate: Continuously Saturday to Monday over the 4 weekends Traffic control to operate, delays expected.
TrafficWatchNI Roadworks