LocaleIQ

Local reports for real address decisions.

Planning report

Planning near BT82 8LS

Local change

Planning permissions and roadworks near BT82 8LS

Northern Ireland Planning Statistics · latest 27 Nov 2024
Planning records shown4displayed nearby records
RoadworksNone listedno current records listed
Planning

Planning applications

  1. planning27 Nov 2024920 m

    Planning application: Lands between 44 and 46 Hollyhill Road, Strabane, BT82 0AB

    Outline Local Proposed erection of two infill dwellings and domestic garages Authority: Derry City and Strabane. Status: Pending.

    Northern Ireland Planning Statistics

  2. planning6 Feb 2023909 m

    Planning application: Approximately 520 M. South West of 83 Curlyhill Road, Strabane, BT82 8LS

    Full Local Proposed erection of 50m hub height and 47m rotor diameter wind turbine (max 225 kW output) with associated section of additional laneway and construction of hardstanding, proposal to substitute existing installed wind turbine with 30m hub height and 27m rotor diameter (additional information received) Authority: Derry City and Strabane. Status: Pending.

    Northern Ireland Planning Statistics

  3. planning8 Jul 2022916 m

    Planning application: Lands approx 240m South West of 99a Curlyhill Road, Strabane, BT82 8LS

    Full Local Erection of wind turbine (up to 250 kW) with 40m tower height and 53m rotor diameter to replace existing wind turbine with 30m tower height and 30m rotor diameter (approved under J/2012/0221/F) (additional information received) Authority: Derry City and Strabane. Status: Pending.

    Northern Ireland Planning Statistics

  4. planning4 Dec 20191.3 km

    Planning application: Adjoining 89 Woodend Road Ballymagorry through townlands of Ballymagorry Woodend Milltown Ballee Holly-hill Kennaghan Owenreagh Knockanbrack Lagvittal Knocklnarvoer Craignagapple Lagavadder Ballykeery Craigatuke Meendamph Balix Upper Letterbrat Glencoppogagh (Main Portion) Aghalane and Lisnacreaght ending at 681m NW of 24 Meenadoo Road Culvacullion Gortin.

    Full Local 33kV power line involving both construction of above ground 33kV overhead line supported by wooden poles and underground 33kV cable laid below ground level in ducts, to serve Curraghinalt mine (currently under consideration planning application LA10/2017/1249/F). 33kV connection is c37.9 km in length, comprising of c26.9 km of overhead line supported by single and double wooden pole sets and c11 km of underground cabling. c 22.8 km of the powerline is within the Derry City & Strabane District Council area comprising of c 18.7km of overhead line supported by single and double wooden pole sets and c 4.1 km of underground cabling. (Amended Drawing & Pole Schedule) Authority: Department for Infrastructure. Status: Pending.