Planning report
Planning near CB4 1XA
Planning permissions and roadworks near CB4 1XA
Planning applications
- planning30 Jan 2026372 m
Planning at 55 Highworth Avenue Cambridge Cambridgeshire CB4 2BQ
Submission of details required by condition 5 (Arboricultural Method Statement (AMS) and Tree Protection Plan (TPP)) of planning permission 25/03961/HFUL
Greater Cambridge Planning
- planning20 Feb 2026833 m
Planning at 39 Harvey Goodwin Avenue Cambridge Cambridgeshire CB4 3EX
First floor rear extension over existing garden room. Ground floor infill under existing side bedroom
Greater Cambridge Planning
- planning17 Mar 20261.3 km
Planning at 25C City Road Cambridge Cambridgeshire CB1 1DP
Part single storey, part two storey rear/side extension, first floor roof alteration and external cladding.
Greater Cambridge Planning
- planning30 Jan 2026919 m
Planning at Shah Jalal Mosque 107 Darwin Drive Cambridge Cambridgeshire CB4 3HQ
Submission of details required by conditions 11 (Management Plan), 12 (Cycle Parking), 16 (Hard and Soft Landscaping Scheme), 18 (Bin Storage) of planning permission 24/01777/FUL
Greater Cambridge Planning
- planning13 Feb 20261.2 km
Planning at Babbage House Castle Park Cambridge Cambridgeshire CB3 0AT
S73 to vary conditions 2 (approved drawings), 3 (approval of materials) and 28 (approval of details of the trellis on the northeastern boundary) of ref: 23/04037/FUL (Refurbishment and retrofit of existing building with new fourth storey, rooftop plant and rear extension, new cycle parking and landscaping adjacent to the building together with new cycle hub in existing basement car park under Castle Court) for removal of the substation, increase to the approved single storey flat roofed extension, cycle parking changes, removal of the approved bin storage, relocation of the disabled driver parking space, additional landscaping and minor alterations to windows and doors.
Greater Cambridge Planning
- planning19 Mar 20261.4 km
Planning at 1 Rose Crescent Cambridge Cambridgeshire CB2 3LL
Installation of basement tanking.
Greater Cambridge Planning
- planning30 Jan 20261.0 km
Planning at La Mimosa Restaurant Thompsons Lane Cambridge Cambridgeshire CB5 8AQ
T1 - Weeping Willow - Crown reduction of approximately 3 metres, pruning back to previously established pruning points. Reason for Works - The tree has become excessively over-extended since its last pruning cycle and is now impeding the adjacent public footpath, reducing pedestrian clearance and visibility. In addition, the current crown spread is significantly restricting light into the neighbouring public house garden, adversely affecting its use and amenity value.
Greater Cambridge Planning
- planning20 Feb 20261.2 km
Planning at 6 Journey Campus Castle Park Cambridge Cambridgeshire CB3 0AT
Installation of 2no. flues
Greater Cambridge Planning
Roadworks and street disruption
- roadworks10 May 2026 - 12 May 2026250 m
Utility asset works on Footway, Verge
Utility asset works (Works planned) promoted by BT. Highway authority: CAMBRIDGESHIRE COUNTY COUNCIL. Traffic management: Road closure.
DfT Street Manager Open Data
- roadworks14 May 2026 - 18 May 2026390 m
Utility repair and maintenance works on Carriageway
Utility repair and maintenance works (Works planned) promoted by CAMBRIDGE WATER COMPANY. Highway authority: CAMBRIDGESHIRE COUNTY COUNCIL. Traffic management: Road closure.
DfT Street Manager Open Data
- roadworks29 Apr 2026 - 1 May 2026540 m
Utility asset works on Footway, Carriageway, Verge
Utility asset works (Works planned) promoted by BT. Highway authority: CAMBRIDGESHIRE COUNTY COUNCIL. Traffic management: Give and take.
DfT Street Manager Open Data
- roadworks30 Apr 2026 - 4 May 2026597 m
Utility asset works on Footway
Utility asset works (Works planned) promoted by CADENT GAS LIMITED. Highway authority: CAMBRIDGESHIRE COUNTY COUNCIL. Traffic management: Some carriageway incursion.
DfT Street Manager Open Data
- roadworks28 Apr 2026 - 28 Apr 2026986 m
Utility asset works on Footpath
Utility asset works (Works planned) promoted by VIRGIN MEDIA. Highway authority: CAMBRIDGESHIRE COUNTY COUNCIL. Traffic management: No carriageway incursion.
DfT Street Manager Open Data
- roadworks27 Apr 2026 - 28 Apr 20261.0 km
Utility repair and maintenance works on Footway
Utility repair and maintenance works (Works in progress) promoted by CAMBRIDGE WATER COMPANY. Highway authority: CAMBRIDGESHIRE COUNTY COUNCIL. Traffic management: Give and take.
DfT Street Manager Open Data
- roadworks28 Apr 2026 - 28 Apr 20261.0 km
Utility asset works on Footway
Utility asset works (Works planned) promoted by VIRGIN MEDIA. Highway authority: CAMBRIDGESHIRE COUNTY COUNCIL. Traffic management: No carriageway incursion.
DfT Street Manager Open Data
- roadworks16 Aug 2026 - 22 Aug 20261.4 km
New service connection on Carriageway
New service connection (Works planned) promoted by CAMBRIDGE WATER COMPANY. Highway authority: CAMBRIDGESHIRE COUNTY COUNCIL. Traffic management: Lane closure.
DfT Street Manager Open Data