Planning report
Planning near CB5 8TL
Planning permissions and roadworks near CB5 8TL
Planning applications
- planning13 Feb 2026540 m
Planning at 13 Keynes Road Cambridge Cambridgeshire CB5 8PP
Installation of a fixed broad band electronic communication apparatus.
Greater Cambridge Planning
- planning16 Mar 20261.1 km
Planning at 80 Peverel Road Cambridge Cambridgeshire CB5 8RH
Single storey rear extension
Greater Cambridge Planning
- planning5 Feb 2026770 m
Planning at 639 Newmarket Road Cambridge Cambridgeshire CB5 8WL
Refurbishment of restaurant to include redecoration of elevations, blocking up of existing access onto site from the public footpath with new access formed and relocated pedestrian crossing, existing cycle stands to be relocated with 2no new cycle lockers installed and the relocation of the grill bays with associated works to the site.
Greater Cambridge Planning
- planning30 Jan 2026770 m
Planning at 639 Newmarket Road Cambridge Cambridgeshire CB5 8WL
Installation of 1no double-sided internally illuminated freestanding sign and 1no non-illuminated banner sign.
Greater Cambridge Planning
- planning5 Feb 20261.3 km
Planning at The Round House 525 Newmarket Road Cambridge Cambridgeshire CB5 8LG
Submission of details required by conditions 3 (joinery scale of 1:20,) 4 (roof covering), 5 (dormers scale of 1:20) and 6 (non-masonry walling systems) of Listed Building consent 25/02483/LBC
Greater Cambridge Planning
- planning5 Feb 20261.3 km
Planning at The Round House 525 Newmarket Road Cambridge Cambridgeshire CB5 8LG
Submission of details required by condition 6 (arboricultural method statement) of planning permission 25/02482/HFUL
Greater Cambridge Planning
Roadworks and street disruption
- roadworks4 May 2026 - 1 Jun 2026408 m
Disconnection or alteration of supply on Footway, Carriageway, Verge
Disconnection or alteration of supply (Works planned) promoted by UK POWER NETWORKS EASTERN & LONDON. Highway authority: CAMBRIDGESHIRE COUNTY COUNCIL. Traffic management: Road closure.
DfT Street Manager Open Data
- roadworks24 Apr 2026 - 27 Apr 2026666 m
Utility asset works on Footway, Carriageway
Utility asset works (Works in progress) promoted by UK POWER NETWORKS EASTERN & LONDON. Highway authority: CAMBRIDGESHIRE COUNTY COUNCIL. Traffic management: Two-way signals.
DfT Street Manager Open Data
- roadworks28 Apr 2026 - 28 Apr 2026756 m
Highway repair and maintenance works on Carriageway
Highway repair and maintenance works (Works planned) promoted by CAMBRIDGESHIRE COUNTY COUNCIL. Highway authority: CAMBRIDGESHIRE COUNTY COUNCIL. Traffic management: Lane closure.
DfT Street Manager Open Data
- roadworks30 Apr 2026 - 30 Apr 20261.2 km
Utility asset works on Footway
Utility asset works (Works planned) promoted by VIRGIN MEDIA. Highway authority: CAMBRIDGESHIRE COUNTY COUNCIL. Traffic management: No carriageway incursion.
DfT Street Manager Open Data
- roadworks28 Apr 2026 - 28 Apr 20261.2 km
Highway repair and maintenance works on Carriageway
Highway repair and maintenance works (Works planned) promoted by CAMBRIDGESHIRE COUNTY COUNCIL. Highway authority: CAMBRIDGESHIRE COUNTY COUNCIL. Traffic management: Multi-way signals.
DfT Street Manager Open Data
- roadworks27 Apr 2026 - 27 Apr 20261.2 km
Utility repair and maintenance works on Footway
Utility repair and maintenance works (Works planned) promoted by CITYFIBRE METRO NETWORKS LTD. Highway authority: CAMBRIDGESHIRE COUNTY COUNCIL. Traffic management: No carriageway incursion.
DfT Street Manager Open Data
- roadworks25 May 2026 - 27 May 20261.2 km
Disconnection or alteration of supply on Footway
Disconnection or alteration of supply (Works planned) promoted by CADENT GAS LIMITED. Highway authority: CAMBRIDGESHIRE COUNTY COUNCIL. Traffic management: Some carriageway incursion.
DfT Street Manager Open Data