Planning report
Planning near EC1Y 2AA
Planning permissions and roadworks near EC1Y 2AA
Planning applications
- planning27 Mar 20261.4 km
Full Planning Permission at 1 Bleeding Heart Yard & 19 Greville Street London Camden EC1N 8SJ
Full Planning Permission. Erection of third floor extension, roof extension, roof terrace, change of use at third floor level of 19 Greville Street from drinking establishment (Sui Generis) to residential (Class C3) and provision of 1x residential unit at third and fourth floor levels.
Camden Planning
- planning14 Jan 20261.4 km
Approval of Details at Eurowed House 20-24 Kirby Street London EC1N 8TS
Approval of Details. Details pursuant to conditions 5 (cycle storage) and 6 (waste storage) of planning permission 2021/4482/P dated 18/10/2023 (as amended by 2025/0393/P) for the 'Refurbishment and extension of the existing office building (Class E), involving: demolition of existing fifth floor; erection of enlarged fifth floor to create additional office floorspace with associated roof terrace (with plant area above); creation of affordable jewellery workspace at lower ground floor level; internal and external alterations, and other associated works'.
Camden Planning
- planning25 Nov 20251.4 km
Full Planning Permission at 31-32 Ely Place London EC1N 6TD
Full Planning Permission. The replacement of existing basement window with new door and installation of replacement of roof mounted plant over rear extension roof.
Camden Planning
- planning9 Mar 20261.4 km
Advertisement Consent at 29 Greville Street London EC1N 8AF
Advertisement Consent. Installation of internally illuminated suspended sign.
Camden Planning
- planning27 Jan 20261.3 km
Full Planning Permission at 73 Farringdon Road London EC1M 3JQ
Full Planning Permission. Replacement of windows to Farringdon Road and St Cross Street elevations, removal of existing dormer window at roof level and replacement with a new rooflight.
Camden Planning
- planning22 Jan 20261.3 km
Non Material Amendments at 33 Farringdon Road London EC1M 3JF
Non Material Amendments. Non-material amendment to planning permission 2025/2939/P, dated 13/08/2025 for 'alterations to existing entrance including new panelling, replacement lighting, replacement handrails, replacement finishes, and associated external alterations', namely to amend the material specification of the entrance surrounding cladding and entrance floor matt.
Camden Planning
- planning8 Jan 20261.3 km
Full Planning Permission at 29 Saffron Hill London EC1N 8SW
Full Planning Permission. Replacement of the entrance door to the staircase enclosure at Ground Floor Level. Replacement of the Ground Floor loading bay door.
Camden Planning
- planning9 Dec 20251.3 km
Full Planning Permission at The Sir John Oldcastle 29-35 Farringdon Road London EC1M 3JF
Full Planning Permission. Reconfiguration of existing service yard condenser plant involving the removal of 7 no. existing condensers, installation of 6 no. replacement condensers, relocation of 1 no. existing condenser, and associated support frames.
Camden Planning
Roadworks and street disruption
- roadworks1 May 2026 - 1 May 2026283 m
Utility repair and maintenance works on Footway
Utility repair and maintenance works (Works planned) promoted by BT. Highway authority: CITY OF LONDON CORPORATION. Traffic management: No carriageway incursion.
DfT Street Manager Open Data
- roadworks28 Apr 2026 - 30 Apr 2026171 m
Utility asset works on Footway, Carriageway
Utility asset works (Works in progress) promoted by Exponential-e Limited. Highway authority: LONDON BOROUGH OF ISLINGTON. Traffic management: Two-way signals.
DfT Street Manager Open Data
- roadworks28 Apr 2026 - 30 Apr 2026191 m
Utility asset works on Footway, Carriageway
Utility asset works (Works in progress) promoted by Exponential-e Limited. Highway authority: LONDON BOROUGH OF ISLINGTON. Traffic management: Some carriageway incursion.
DfT Street Manager Open Data
- roadworks27 Apr 2026 - 1 May 2026291 m
Utility repair and maintenance works on Footway
Utility repair and maintenance works (Works in progress) promoted by UK POWER NETWORKS EASTERN & LONDON. Highway authority: LONDON BOROUGH OF ISLINGTON. Traffic management: Some carriageway incursion.
DfT Street Manager Open Data
- roadworks14 May 2026 - 14 May 2026412 m
Utility repair and maintenance works on Carriageway
Utility repair and maintenance works (Works planned) promoted by THAMES WATER. Highway authority: CITY OF LONDON CORPORATION. Traffic management: Two-way signals.
DfT Street Manager Open Data
- roadworks29 Apr 2026 - 30 Apr 2026421 m
Utility asset works on Footway, Carriageway
Utility asset works (Works planned) promoted by G. NETWORK COMMUNICATIONS LTD. Highway authority: LONDON BOROUGH OF HACKNEY. Traffic management: No carriageway incursion.
DfT Street Manager Open Data
- roadworks28 Apr 2026 - 28 Apr 2026441 m
Permanent reinstatement on Footway
Permanent reinstatement (Works in progress) promoted by VORBOSS LIMITED. Highway authority: CITY OF LONDON CORPORATION. Traffic management: No carriageway incursion.
DfT Street Manager Open Data
- roadworks27 Apr 2026 - 28 Apr 2026479 m
Highway repair and maintenance works on Carriageway
Highway repair and maintenance works (Works in progress) promoted by LONDON BOROUGH OF HACKNEY. Highway authority: LONDON BOROUGH OF HACKNEY. Traffic management: Give and take.
DfT Street Manager Open Data