Planning report
Planning near EC1Y 8AA
Planning permissions and roadworks near EC1Y 8AA
Planning applications
- planning24 Apr 20261.1 km
Full Planning Permission at New House 67-68 Hatton Garden London EC1N 8JY
Full Planning Permission. Proposed refurbishment of the existing office (Class E) building including infilling of north and south lightwells; rear extension at the fourth, fifth, sixth and seventh floors to create additional Class E floorspace; provision of roof terrace at rear of 7th floor and northern elevation of 6th floor; consolidation of plant within new enclosure at roof level.
Camden Planning
- planning27 Mar 20261.0 km
Full Planning Permission at 1 Bleeding Heart Yard & 19 Greville Street London Camden EC1N 8SJ
Full Planning Permission. Erection of third floor extension, roof extension, roof terrace, change of use at third floor level of 19 Greville Street from drinking establishment (Sui Generis) to residential (Class C3) and provision of 1x residential unit at third and fourth floor levels.
Camden Planning
- planning17 Apr 20261.1 km
Request for Observations to Adjoining Borough at 61 - 65 Holborn Viaduct London EC1A 2FD
Request for Observations to Adjoining Borough. Application under Section 73 of the Town and Country Planning Act 1990 (as amended) to vary condition 45 (Cycle Parking) to update the cycle parking mix and quantum and vary condition 63 (Approved Drawings) to replace the amenity spaces on levels 02 to 05 with four additional PBSA studio rooms, reflect the change in cycle parking arrangement and introduce the new larger amenity space at Basement level 02 of planning permission 22/01243/FULMAJ dated 21/09/2023.
Camden Planning
- planning10 Apr 20261.2 km
Full Planning Permission at 3-11 Eyre Street Hill London Camden EC1R 5ET
Full Planning Permission. Change of use of the first floor from office (Class E) to part office (Class E) (retained) and part residential (Class C3) to create a 3-bedroom unit.
Camden Planning
- planning9 Apr 20261.1 km
Full Planning Permission at County House 14-15 Hatton Garden London EC1N 8AT
Full Planning Permission. Alterations at front ground floor level, involving the replacement of single glazed metal frame entrance doors to office accommodation above and fixed glazed metal frame side panels with double-glazed aluminium frame doors and fixed double-glazed side panels.
Camden Planning
- planning22 Apr 20261.3 km
Listed Building Consent at Skipwith House, Flat 24 Portpool Lane London Camden EC1N 7UH
Listed Building Consent. Subdivision of existing bedroom to create two separate rooms (retrospective)
Camden Planning
- planning3 Apr 20261.2 km
Full Planning Permission at Vesage Court 8A Leather Lane London EC1N 7RF
Full Planning Permission. The installation of 3no. wall-mounted antenna poles supporting 2no. antennas each on the west, north and eastern corners of the rooftop for a total of 6no. antennas, 4no. 600mm transmission dishes along with 3no. equipment cabinets and ancillary development thereto all at roof level.
Camden Planning
- planning9 Mar 2026995 m
Advertisement Consent at 29 Greville Street London EC1N 8AF
Advertisement Consent. Installation of internally illuminated suspended sign.
Camden Planning
Roadworks and street disruption
- roadworks11 May 2026 - 12 Dec 202678 m
Highway improvement works on Footway
Highway improvement works (Works planned) promoted by CITY OF LONDON CORPORATION. Highway authority: CITY OF LONDON CORPORATION. Traffic management: Some carriageway incursion.
DfT Street Manager Open Data
- roadworks1 May 2026 - 1 May 2026127 m
Utility repair and maintenance works on Footway
Utility repair and maintenance works (Works planned) promoted by BT. Highway authority: CITY OF LONDON CORPORATION. Traffic management: No carriageway incursion.
DfT Street Manager Open Data
- roadworks27 Apr 2026 - 1 May 2026199 m
Utility repair and maintenance works on Footway
Utility repair and maintenance works (Works in progress) promoted by UK POWER NETWORKS EASTERN & LONDON. Highway authority: LONDON BOROUGH OF ISLINGTON. Traffic management: No carriageway incursion.
DfT Street Manager Open Data
- roadworks27 Apr 2026 - 27 Apr 2026214 m
Utility repair and maintenance works on Footway
Utility repair and maintenance works (Works in progress) promoted by CADENT GAS LIMITED. Highway authority: LONDON BOROUGH OF ISLINGTON. Traffic management: No carriageway incursion.
DfT Street Manager Open Data
- roadworks24 Apr 2026 - 28 Apr 2026429 m
Highway repair and maintenance works on Footway
Highway repair and maintenance works (Works in progress) promoted by CITY OF LONDON CORPORATION. Highway authority: CITY OF LONDON CORPORATION. Traffic management: Some carriageway incursion.
DfT Street Manager Open Data
- roadworks29 Apr 2026 - 30 Apr 2026315 m
Remedial works on Footway
Remedial works (Works planned) promoted by THAMES WATER. Highway authority: LONDON BOROUGH OF ISLINGTON. Traffic management: Some carriageway incursion.
DfT Street Manager Open Data
- roadworks27 Apr 2026 - 10 May 2026524 m
Highway improvement works on Footway
Highway improvement works (Works in progress) promoted by CITY OF LONDON CORPORATION. Highway authority: CITY OF LONDON CORPORATION. Traffic management: No carriageway incursion.
DfT Street Manager Open Data
- roadworks25 Apr 2026 - 31 Jul 2026542 m
Highway improvement works on Footway
Highway improvement works (Works in progress) promoted by CITY OF LONDON CORPORATION. Highway authority: CITY OF LONDON CORPORATION. Traffic management: No carriageway incursion.
DfT Street Manager Open Data