LocaleIQ

Local reports for real address decisions.

Planning report

Planning near EC1Y 8AE

Local change

Planning permissions and roadworks near EC1Y 8AE

DfT Street Manager Open Data, Camden Planning · latest 2 Oct 2027
Planning records shown186displayed nearby records
Roadworks64street disruption listed
Planning

Planning applications

  1. planning27 Jan 20261.3 km

    Full Planning Permission at 73 Farringdon Road London EC1M 3JQ

    Full Planning Permission. Replacement of windows to Farringdon Road and St Cross Street elevations, removal of existing dormer window at roof level and replacement with a new rooflight.

    Camden Planning

  2. planning22 Jan 20261.4 km

    Non Material Amendments at 33 Farringdon Road London EC1M 3JF

    Non Material Amendments. Non-material amendment to planning permission 2025/2939/P, dated 13/08/2025 for 'alterations to existing entrance including new panelling, replacement lighting, replacement handrails, replacement finishes, and associated external alterations', namely to amend the material specification of the entrance surrounding cladding and entrance floor matt.

    Camden Planning

  3. planning8 Jan 20261.4 km

    Full Planning Permission at 29 Saffron Hill London EC1N 8SW

    Full Planning Permission. Replacement of the entrance door to the staircase enclosure at Ground Floor Level. Replacement of the Ground Floor loading bay door.

    Camden Planning

  4. planning9 Dec 20251.4 km

    Full Planning Permission at The Sir John Oldcastle 29-35 Farringdon Road London EC1M 3JF

    Full Planning Permission. Reconfiguration of existing service yard condenser plant involving the removal of 7 no. existing condensers, installation of 6 no. replacement condensers, relocation of 1 no. existing condenser, and associated support frames.

    Camden Planning

  5. planning1 Dec 20251.3 km

    Request for Observations to Adjoining Borough at 74 King's Cross Road London WC1X 9QG

    Request for Observations to Adjoining Borough. Replacement of existing uPVC frame windows with uPVC frame windows.

    Camden Planning

  6. planning9 Sep 20251.4 km

    Planning application:

    England Planning Register

  7. planning9 Sep 20251.4 km

    Planning application:

    England Planning Register

  8. planning9 Sep 20251.4 km

    Planning application:

    England Planning Register

Streetworks

Roadworks and street disruption

  1. roadworks1 Jul 2026 - 7 Jul 2026268 m

    Utility repair and maintenance works on Footway

    Utility repair and maintenance works (Works planned) promoted by UK POWER NETWORKS EASTERN & LONDON. Highway authority: LONDON BOROUGH OF ISLINGTON. Traffic management: Some carriageway incursion.

    DfT Street Manager Open Data

  2. roadworks28 Apr 2026 - 30 Apr 2026360 m

    Utility asset works on Footway, Carriageway

    Utility asset works (Works in progress) promoted by Exponential-e Limited. Highway authority: LONDON BOROUGH OF ISLINGTON. Traffic management: Some carriageway incursion.

    DfT Street Manager Open Data

  3. roadworks27 Apr 2026 - 1 May 2026324 m

    Utility repair and maintenance works on Footway

    Utility repair and maintenance works (Works in progress) promoted by UK POWER NETWORKS EASTERN & LONDON. Highway authority: LONDON BOROUGH OF ISLINGTON. Traffic management: Some carriageway incursion.

    DfT Street Manager Open Data

  4. roadworks28 Apr 2026 - 30 Apr 2026372 m

    Utility asset works on Footway, Carriageway

    Utility asset works (Works in progress) promoted by Exponential-e Limited. Highway authority: LONDON BOROUGH OF ISLINGTON. Traffic management: Two-way signals.

    DfT Street Manager Open Data

  5. roadworks4 Aug 2026 - 8 Aug 2026407 m

    Utility asset works on Footway, Carriageway

    Utility asset works (Works planned) promoted by THAMES WATER. Highway authority: TRANSPORT FOR LONDON (TFL). Traffic management: Lane closure.

    DfT Street Manager Open Data

  6. roadworks28 Apr 2026 - 29 Apr 2026456 m

    New service connection on Footway, Carriageway

    New service connection (Works in progress) promoted by THAMES WATER. Highway authority: LONDON BOROUGH OF ISLINGTON. Traffic management: Road closure.

    DfT Street Manager Open Data

  7. roadworks1 May 2026 - 1 May 2026483 m

    Utility repair and maintenance works on Footway

    Utility repair and maintenance works (Works planned) promoted by BT. Highway authority: CITY OF LONDON CORPORATION. Traffic management: No carriageway incursion.

    DfT Street Manager Open Data

  8. roadworks28 Apr 2026 - 29 Apr 2026497 m

    Utility asset works on Footway

    Utility asset works (Works in progress) promoted by VIRGIN MEDIA. Highway authority: LONDON BOROUGH OF HACKNEY. Traffic management: No carriageway incursion.

    DfT Street Manager Open Data