LocaleIQ

Local reports for real address decisions.

Planning report

Planning near EC4A 1AB

Local change

Planning permissions and roadworks near EC4A 1AB

DfT Street Manager Open Data, Camden Planning · latest 12 Dec 2026
Planning records shown1,074displayed nearby records
Roadworks54street disruption listed
Planning

Planning applications

  1. planning24 Apr 2026400 m

    Full Planning Permission at New House 67-68 Hatton Garden London EC1N 8JY

    Full Planning Permission. Proposed refurbishment of the existing office (Class E) building including infilling of north and south lightwells; rear extension at the fourth, fifth, sixth and seventh floors to create additional Class E floorspace; provision of roof terrace at rear of 7th floor and northern elevation of 6th floor; consolidation of plant within new enclosure at roof level.

    Camden Planning

  2. planning24 Apr 2026464 m

    Approval of Details at 14 Bedford Row 12-13 and 14 Jockey's Fields London WC1R 4ED

    Approval of Details. Details to discharge Condition 7 (Rainwater Recycling Storage) of planning reference 2024/1810/P dated 18/12/24 for change of use from Office (Use Class E) to Apart-Hotel (Use Class C1), partial demolition of link structure, introduction of terrace, rooftop plant and other associated physical works.

    Camden Planning

  3. planning17 Apr 2026225 m

    Request for Observations to Adjoining Borough at 61 - 65 Holborn Viaduct London EC1A 2FD

    Request for Observations to Adjoining Borough. Application under Section 73 of the Town and Country Planning Act 1990 (as amended) to vary condition 45 (Cycle Parking) to update the cycle parking mix and quantum and vary condition 63 (Approved Drawings) to replace the amenity spaces on levels 02 to 05 with four additional PBSA studio rooms, reflect the change in cycle parking arrangement and introduce the new larger amenity space at Basement level 02 of planning permission 22/01243/FULMAJ dated 21/09/2023.

    Camden Planning

  4. planning21 Apr 2026464 m

    Approval of Details at 14 Bedford Row 12-13 and 14 Jockey's Fields London WC1R 4ED

    Approval of Details. Details to discharge Condition 14 (Secure Cycle Storage) of planning reference 2024/1810/P dated 18/12/24 for change of use from Office (Use Class E) to Apart-Hotel (Use Class C1), partial demolition of link structure, introduction of terrace, rooftop plant and other associated physical works.

    Camden Planning

  5. planning3 Apr 2026190 m

    Full Planning Permission at Vesage Court 8A Leather Lane London EC1N 7RF

    Full Planning Permission. The installation of 3no. wall-mounted antenna poles supporting 2no. antennas each on the west, north and eastern corners of the rooftop for a total of 6no. antennas, 4no. 600mm transmission dishes along with 3no. equipment cabinets and ancillary development thereto all at roof level.

    Camden Planning

  6. planning27 Mar 2026332 m

    Full Planning Permission at 1 Bleeding Heart Yard & 19 Greville Street London Camden EC1N 8SJ

    Full Planning Permission. Erection of third floor extension, roof extension, roof terrace, change of use at third floor level of 19 Greville Street from drinking establishment (Sui Generis) to residential (Class C3) and provision of 1x residential unit at third and fourth floor levels.

    Camden Planning

  7. planning9 Apr 2026249 m

    Full Planning Permission at County House 14-15 Hatton Garden London EC1N 8AT

    Full Planning Permission. Alterations at front ground floor level, involving the replacement of single glazed metal frame entrance doors to office accommodation above and fixed glazed metal frame side panels with double-glazed aluminium frame doors and fixed double-glazed side panels.

    Camden Planning

  8. planning30 Mar 2026195 m

    Full Planning Permission at 3-4 South Square London WC1R 5HP

    Full Planning Permission. Erection of plant enclosure and installation of heat pumps at ground level within The Paddocks service road to serve 3-4 South Square.

    Camden Planning

Streetworks

Roadworks and street disruption

  1. roadworks12 May 2026 - 12 May 202661 m

    Utility asset works on Carriageway

    Utility asset works (Works planned) promoted by BT. Highway authority: CITY OF LONDON CORPORATION. Traffic management: Some carriageway incursion.

    DfT Street Manager Open Data

  2. roadworks30 Apr 2026 - 5 May 2026370 m

    Utility asset works on Footway

    Utility asset works (Works planned) promoted by BT. Highway authority: LONDON BOROUGH OF CAMDEN. Traffic management: No carriageway incursion.

    DfT Street Manager Open Data

  3. roadworks27 Apr 2026 - 27 Apr 2026487 m

    Remedial works on Footway

    Remedial works (Works in progress) promoted by THAMES WATER. Highway authority: LONDON BOROUGH OF CAMDEN. Traffic management: Some carriageway incursion.

    DfT Street Manager Open Data

  4. roadworks22 May 2026 - 22 May 2026522 m

    Remedial works on Carriageway

    Remedial works (Works planned) promoted by BT. Highway authority: CITY OF WESTMINSTER. Traffic management: Lane closure.

    DfT Street Manager Open Data

  5. roadworks19 May 2026 - 22 May 2026533 m

    Utility repair and maintenance works on Carriageway

    Utility repair and maintenance works (Works planned) promoted by LUMEN TECHNOLOGIES INC. Highway authority: TRANSPORT FOR LONDON (TFL). Traffic management: Some carriageway incursion.

    DfT Street Manager Open Data

  6. roadworks7 May 2026 - 8 May 2026580 m

    Highway repair and maintenance works on Carriageway

    Highway repair and maintenance works (Works planned) promoted by TRANSPORT FOR LONDON (TFL). Highway authority: TRANSPORT FOR LONDON (TFL). Traffic management: Lane closure.

    DfT Street Manager Open Data

  7. roadworks19 May 2026 - 25 May 2026668 m

    Utility asset works on Footway, Carriageway

    Utility asset works (Works planned) promoted by THAMES WATER. Highway authority: CITY OF LONDON CORPORATION. Traffic management: Priority working.

    DfT Street Manager Open Data

  8. roadworks23 Apr 2026 - 29 Apr 2026648 m

    Utility repair and maintenance works on Footway

    Utility repair and maintenance works (Works in progress) promoted by UK POWER NETWORKS EASTERN & LONDON. Highway authority: LONDON BOROUGH OF CAMDEN. Traffic management: Some carriageway incursion.

    DfT Street Manager Open Data