Planning report
Planning near N19 3LU
Planning permissions and roadworks near N19 3LU
Planning applications
- planning14 Apr 20261.4 km
Certificate of Lawfulness (Proposed) at 37 Dartmouth Park Avenue London NW5 1JL
Certificate of Lawfulness (Proposed). Removal of rear chimney breast and stack, removal of external staircase to rear, and installation of new windows on rear elevation.
Camden Planning
- planning27 Mar 20261.1 km
Application for Works to Tree(s) covered by a TPO at Channing Junior School 1 Highgate High Street London N6 5JR
Application for Works to Tree(s) covered by a TPO. (AREA TPO REF; A1) IN FRONT GROUNDS: 1 x English Holly (T2) - Removal of dead stem (see report).
Camden Planning
- planning9 Apr 20261.4 km
Full Planning Permission at Former 271 Bus Stand, Highgate High Street, N6 5JX
Full Planning Permission. Remedial works to former bus stop to create a public space, including new paving, installation of electrical supply for market stalls, provision of seating, planting of trees, and installation of a tourist information board.
Camden Planning
- planning25 Mar 20261.4 km
Notification of Intended Works to Tree(s) in a Conservation Area at Highgate Cemetery Swain's Lane London N6 6PJ
Notification of Intended Works to Tree(s) in a Conservation Area. WEST CEMETERY: 1 x Holly (T264) - Fell the leaning stem/trunk that extends over the main Cuttings Path.
Camden Planning
- planning27 Feb 20261.1 km
Notification of Intended Works to Tree(s) in a Conservation Area at Highgate Mental Health Centre Dartmouth Park Hill London N19 5NX
Notification of Intended Works to Tree(s) in a Conservation Area. IN GROUNDS AT REAR: 1 x Birch (T1) - Fell to ground level. 1 x Birch (T2) - Fell to ground level.
Camden Planning
- planning17 Mar 20261.4 km
Listed Building Consent at 2 South Grove London N6 6BS
Listed Building Consent. External painting of ground floor commercial frontage from white to cobalt blue (RAL 5013) and installation of signage.
Camden Planning
- planning17 Mar 20261.4 km
Advertisement Consent at 2 South Grove London N6 6BS
Advertisement Consent. Display of 1 x externally illuminated fascia sign over the main and side facades and 1 x non-illuminated projecting sign on the southwestern end of the main facade.
Camden Planning
- planning9 Sep 2025999 m
Planning application:
England Planning Register
Roadworks and street disruption
- roadworks29 Apr 2026 - 30 Apr 202698 m
Remedial works on Footway
Remedial works (Works planned) promoted by BT. Highway authority: LONDON BOROUGH OF ISLINGTON. Traffic management: No carriageway incursion.
DfT Street Manager Open Data
- roadworks21 Apr 2026 - 5 May 2026266 m
Utility repair and maintenance works on Footway, Carriageway
Utility repair and maintenance works (Works in progress) promoted by CADENT GAS LIMITED. Highway authority: LONDON BOROUGH OF ISLINGTON. Traffic management: Some carriageway incursion.
DfT Street Manager Open Data
- roadworks26 Apr 2026 - 1 May 2026406 m
Utility repair and maintenance works on Footway
Utility repair and maintenance works (Works in progress) promoted by UK POWER NETWORKS EASTERN & LONDON. Highway authority: LONDON BOROUGH OF ISLINGTON. Traffic management: Some carriageway incursion.
DfT Street Manager Open Data
- roadworks12 May 2026 - 14 May 2026419 m
Utility asset works on Footway, Carriageway
Utility asset works (Works planned) promoted by BT. Highway authority: LONDON BOROUGH OF ISLINGTON. Traffic management: Give and take.
DfT Street Manager Open Data
- roadworks29 Apr 2026 - 29 Apr 2026518 m
Utility asset works on Footway
Utility asset works (Works planned) promoted by VIRGIN MEDIA. Highway authority: LONDON BOROUGH OF ISLINGTON. Traffic management: No carriageway incursion.
DfT Street Manager Open Data
- roadworks27 Apr 2026 - 1 May 2026524 m
Utility repair and maintenance works on Footway
Utility repair and maintenance works (Works in progress) promoted by UK POWER NETWORKS EASTERN & LONDON. Highway authority: LONDON BOROUGH OF ISLINGTON. Traffic management: No carriageway incursion.
DfT Street Manager Open Data
- roadworks28 Apr 2026 - 29 Apr 2026582 m
Utility asset works on Footway
Utility asset works (Works planned) promoted by BT. Highway authority: LONDON BOROUGH OF ISLINGTON. Traffic management: No carriageway incursion.
DfT Street Manager Open Data
- roadworks24 Apr 2026 - 30 Apr 2026666 m
Utility repair and maintenance works on Carriageway
Utility repair and maintenance works (Works in progress) promoted by THAMES WATER. Highway authority: LONDON BOROUGH OF HARINGEY. Traffic management: Some carriageway incursion.
DfT Street Manager Open Data