LocaleIQ

Local reports for real address decisions.

Planning report

Planning near NW3 7NN

Local change

Planning permissions and roadworks near NW3 7NN

DfT Street Manager Open Data, Camden Planning · latest 30 Nov 2026
Planning records shown1,031displayed nearby records
Roadworks45street disruption listed
Planning

Planning applications

  1. planning22 Apr 202696 m

    Notification of Intended Works to Tree(s) in a Conservation Area at 15 Platt's Lane London NW3 7NP

    Notification of Intended Works to Tree(s) in a Conservation Area. FRONT GARDEN: 1 x Cordyline (T2) - Remove the leaning trunk to a height of 1.2m.

    Camden Planning

  2. planning2 Mar 202649 m

    Approval of Details at 18 Flat 1 Platt's Lane London NW3 7NS

    Approval of Details. Details pursuant to condition 4 (detailed drawing) of planning permission 2024/5582/P granted via appeal (APP/X5210/W/25/3365320) on 08/09/2025 for erection of a single storey ground floor front extension.

    Camden Planning

  3. planning10 Mar 2026171 m

    Householder Application at 376 Finchley Road London NW3 7AJ

    Householder Application. Excavation to form a basement extension with lightwell to rear elevation; erection of a single storey rear extension; construction of a rear dormer and a side hipped dormer extension to the flank elevation; and the provision of new hard and soft landscaping to the front elevation, including a new boundary fence, sliding gates, and a revised staircase arrangement

    Camden Planning

  4. planning21 Apr 2026325 m

    Certificate of Lawfulness (Proposed) at 71 Redington Road London NW3 7RP

    Certificate of Lawfulness (Proposed). Amalgamation of 2 x residential units over lower ground, ground and 1st floors into a single self-contained residential unit (Class C3).

    Camden Planning

  5. planning21 Apr 2026325 m

    Certificate of Lawfulness (Proposed) at 71 Redington Road London NW3 7RP

    Certificate of Lawfulness (Proposed). Amalgamation of 2 x residential units over lower ground, ground and 1st floors into a single self-contained residential unit (Class C3).

    Camden Planning

  6. planning23 Mar 2026118 m

    Notification of Intended Works to Tree(s) in a Conservation Area at 12A Hollycroft Avenue London NW3 7QL

    Notification of Intended Works to Tree(s) in a Conservation Area. REAR GARDEN: 1 x Sycamore (T1) - Reduce overall crown by up to 3m.

    Camden Planning

  7. planning23 Mar 2026118 m

    Application for Works to Tree(s) covered by a TPO at 12A Hollycroft Avenue London NW3 7QL

    Application for Works to Tree(s) covered by a TPO. (TPO REF: C1323 2023) REAR GARDEN: 1 x Sycamore (T2) - Reduce overall crown by up to 3m.

    Camden Planning

  8. planning24 Apr 2026380 m

    Notification of Intended Works to Tree(s) in a Conservation Area at 48 Redington Road London NW3 7RS

    Notification of Intended Works to Tree(s) in a Conservation Area. FRONT GARDEN: 1 x Robinia (T2) - Fell to ground level. 1 x Oak (T4) - Crown reduce by 2m back to previous points. 1 x Indian Bean (T15) - Fell to ground level.

    Camden Planning

Streetworks

Roadworks and street disruption

  1. roadworks27 Apr 2026 - 29 Apr 2026209 m

    Utility asset works on Footway

    Utility asset works (Works planned) promoted by BT. Highway authority: LONDON BOROUGH OF BARNET. Traffic management: Some carriageway incursion.

    DfT Street Manager Open Data

  2. roadworks27 Apr 2026 - 28 Apr 202632 m

    New service connection on Footway

    New service connection (Works in progress) promoted by BT. Highway authority: LONDON BOROUGH OF CAMDEN. Traffic management: Some carriageway incursion.

    DfT Street Manager Open Data

  3. roadworks29 Apr 2026 - 30 Apr 2026328 m

    New service connection on Footway

    New service connection (Works planned) promoted by BT. Highway authority: LONDON BOROUGH OF BARNET. Traffic management: Some carriageway incursion.

    DfT Street Manager Open Data

  4. roadworks27 Apr 2026 - 28 Apr 2026356 m

    New service connection on Footway

    New service connection (Works planned) promoted by BT. Highway authority: LONDON BOROUGH OF CAMDEN. Traffic management: Some carriageway incursion.

    DfT Street Manager Open Data

  5. roadworks28 Apr 2026 - 29 Apr 2026381 m

    New service connection on Footway

    New service connection (Works planned) promoted by BT. Highway authority: LONDON BOROUGH OF CAMDEN. Traffic management: No carriageway incursion.

    DfT Street Manager Open Data

  6. roadworks28 Apr 2026 - 30 Apr 2026381 m

    New service connection on Footway

    New service connection (Works planned) promoted by BT. Highway authority: LONDON BOROUGH OF CAMDEN. Traffic management: No carriageway incursion.

    DfT Street Manager Open Data

  7. roadworks20 May 2026 - 20 May 2026638 m

    Utility asset works on Footway

    Utility asset works (Works planned) promoted by VIRGIN MEDIA. Highway authority: LONDON BOROUGH OF CAMDEN. Traffic management: Some carriageway incursion.

    DfT Street Manager Open Data

  8. roadworks29 Apr 2026 - 30 Apr 2026642 m

    Utility asset works on Footway

    Utility asset works (Works planned) promoted by HYPEROPTIC LTD. Highway authority: LONDON BOROUGH OF BARNET. Traffic management: No carriageway incursion.

    DfT Street Manager Open Data