Planning report
Planning near NW8 6AX
Planning permissions and roadworks near NW8 6AX
Planning applications
- planning17 Apr 2026368 m
Non Material Amendments at 31 Elsworthy Road London Camden NW3 3BT
Non Material Amendments. Non-material amendments to planning permission 2024/3098/P on 05/02/2025 for extensions (incl. at basement level and a single storey rear extension and front alterations including a front lightwell and the replacement of front garage door with windows). Proposed amendments are the reconfiguration of the study/office window on the front elevation to reflect a 2 x 3 format.
Camden Planning
- planning15 Apr 2026191 m
Notification of Intended Works to Tree(s) in a Conservation Area at 53 Elsworthy Road London NW3 3BS
Notification of Intended Works to Tree(s) in a Conservation Area. REAR GARDEN: 1 x Magnolia (T1) - Crown reduction of approx. 1m in height and 1m lateral spread, approx. 20% reduction.
Camden Planning
- planning16 Mar 2026195 m
Certificate of Lawfulness (Existing) at 34 Avenue Road London NW8 6BU
Certificate of Lawfulness (Existing). Commencement of works in accordance with condition 1 (within three years from date of permission) of planning permission (2022/2014/P) granted 14.06.2023 for the demolition of the existing house and replacement with a two-storey dwellinghouse plus an attic floor, basement, landscaping, parking and associated works.
Camden Planning
- planning14 Apr 2026242 m
Householder Application at 2 Wadham Gardens London NW3 3DP
Householder Application. Alterations to the front elevation, comprising the erection of a first-floor bay window and alterations to the central window
Camden Planning
- planning15 Apr 2026509 m
Certificate of Lawfulness (Existing) at 84 Hawtrey Road London Camden NW3 3SS
Certificate of Lawfulness (Existing). Erection of single-storey rear extension, replacement of front and rear windows, garage conversion including replacement of garage door with window, and replacement of rear garden fence with white rendered wall.
Camden Planning
- planning15 Apr 2026509 m
Historic application at 84 Hawtrey Road London NW3 3SS
Historic application. Erection of an additional storey above dwellinghouse.
Camden Planning
- planning20 Mar 2026119 m
Notification of Intended Works to Tree(s) in a Conservation Area at 44 Avenue Road London NW8 6HS
Notification of Intended Works to Tree(s) in a Conservation Area. REAR GARDEN: 1 x Norway Maple (8m) (T1) - Crown thin by 30%. 1 x Holm Oak (T2) - Fell to ground level. 1 x Cherry (T3) - Fell to ground level.
Camden Planning
- planning13 Feb 202653 m
Householder Application at 37 A Queen's Grove London NW8 6HN
Householder Application. Erection of a ground and first floor rear extension, roof alterations including infill extension and dormer alterations, excavation of a basement with front lightwell, landscaping with bin and bike stores and associated external alterations.
Camden Planning
Roadworks and street disruption
- roadworks5 May 2026 - 8 May 2026174 m
Highway repair and maintenance works on Footway
Highway repair and maintenance works (Works planned) promoted by CITY OF WESTMINSTER. Highway authority: CITY OF WESTMINSTER. Traffic management: Some carriageway incursion.
DfT Street Manager Open Data
- roadworks27 Apr 2026 - 28 Apr 2026405 m
Utility asset works on Footway
Utility asset works (Works planned) promoted by BT. Highway authority: LONDON BOROUGH OF CAMDEN. Traffic management: No carriageway incursion.
DfT Street Manager Open Data
- roadworks22 May 2026 - 22 May 2026488 m
Utility repair and maintenance works on Carriageway
Utility repair and maintenance works (Works planned) promoted by THAMES WATER. Highway authority: TRANSPORT FOR LONDON (TFL). Traffic management: Two-way signals.
DfT Street Manager Open Data
- roadworks19 Apr 2026 - 16 Aug 2026411 m
Section 50 on Footway, Carriageway, Bus stop or stand
Section 50 (Works in progress) promoted by HS2 LTD. Highway authority: LONDON BOROUGH OF CAMDEN. Traffic management: Road closure.
DfT Street Manager Open Data
- roadworks28 Apr 2026 - 30 Apr 2026520 m
Utility asset works on Footway
Utility asset works (Works planned) promoted by BT. Highway authority: CITY OF WESTMINSTER. Traffic management: No carriageway incursion.
DfT Street Manager Open Data
- roadworks27 Apr 2026 - 29 Apr 2026520 m
Highway repair and maintenance works on Footway
Highway repair and maintenance works (Works in progress) promoted by CITY OF WESTMINSTER. Highway authority: CITY OF WESTMINSTER. Traffic management: Some carriageway incursion.
DfT Street Manager Open Data
- roadworks30 Apr 2026 - 4 May 2026548 m
Utility asset works on Footway
Utility asset works (Works planned) promoted by BT. Highway authority: CITY OF WESTMINSTER. Traffic management: No carriageway incursion.
DfT Street Manager Open Data
- roadworks19 Apr 2026 - 13 Jun 2027522 m
Section 50 on Footway, Carriageway, Parking place, Cycle hire docking station
Section 50 (Works in progress) promoted by HS2 LTD. Highway authority: LONDON BOROUGH OF CAMDEN. Traffic management: Road closure.
DfT Street Manager Open Data