Planning report
Planning near CB5 8HN
Planning permissions and roadworks near CB5 8HN
Planning applications
- planning16 Mar 2026415 m
Planning at Cambridge Retail Park, Unit 4 Newmarket Road Cambridge Cambridgeshire CB5 8WR
Submission of details required by condition 5 (noise insulation/mitigation scheme) of planning permission 24/04804/FUL
Greater Cambridge Planning
- planning5 Feb 2026746 m
Planning at The Round House 525 Newmarket Road Cambridge Cambridgeshire CB5 8LG
Submission of details required by conditions 3 (joinery scale of 1:20,) 4 (roof covering), 5 (dormers scale of 1:20) and 6 (non-masonry walling systems) of Listed Building consent 25/02483/LBC
Greater Cambridge Planning
- planning17 Mar 20261.1 km
Planning at 138 Gwydir Street Cambridge Cambridgeshire CB1 2LL
Single storey rear lean-to extension, installation of 1 No. rooflight, raising of the south boundary wall by 285mm and associated internal alterations.
Greater Cambridge Planning
- planning17 Mar 20261.1 km
Planning at 25C City Road Cambridge Cambridgeshire CB1 1DP
Part single storey, part two storey rear/side extension, first floor roof alteration and external cladding.
Greater Cambridge Planning
- planning5 Feb 2026746 m
Planning at The Round House 525 Newmarket Road Cambridge Cambridgeshire CB5 8LG
Submission of details required by condition 6 (arboricultural method statement) of planning permission 25/02482/HFUL
Greater Cambridge Planning
- planning18 Mar 20261.4 km
Planning at 22 Parkside Cambridge Cambridgeshire CB1 1JE
T1 - Mature sycamore (self-set) - Removal to ground level and treatment of stump with eco-plugs. Justification: The self-set sycamore has become established directly against a listed boundary wall that borders both a neighbouring property and the Emmanuel College grounds, including the school playground area. Due to the trees root system becoming entrenched within the wall structure, it is now exerting pressure on the wall and pushing it out of alignment. The condition of the wall has visibly deteriorated and there are concerns that structural failure may occur if the situation is allowed to progress. Given the proximity to areas used by the public and school pupils, this raises clear safety and public liability concerns.
Greater Cambridge Planning
- planning13 Feb 20261.2 km
Planning at 37 Chesterfield Road Cambridge Cambridgeshire CB4 1LN
Submission of details required by conditions 4 (arboricultural method statement and tree protection plan) and 5 (tree protection) of planning permission 25/01515/S73
Greater Cambridge Planning
- planning5 Feb 20261.3 km
Planning at 21A Emery Street Cambridge Cambridgeshire CB1 2AX
Submission of details required by condition 3 (metal cladding) of planning permission 22/04080/HFUL
Greater Cambridge Planning
Roadworks and street disruption
- roadworks28 Apr 2026 - 29 Apr 2026282 m
Utility asset works on Footway
Utility asset works (Works planned) promoted by VIRGIN MEDIA. Highway authority: CAMBRIDGESHIRE COUNTY COUNCIL. Traffic management: No carriageway incursion.
DfT Street Manager Open Data
- roadworks16 Aug 2026 - 22 Aug 2026427 m
New service connection on Carriageway
New service connection (Works planned) promoted by CAMBRIDGE WATER COMPANY. Highway authority: CAMBRIDGESHIRE COUNTY COUNCIL. Traffic management: Lane closure.
DfT Street Manager Open Data
- roadworks7 May 2026 - 8 May 2026431 m
Utility asset works on Footway, Carriageway
Utility asset works (Works planned) promoted by UK POWER NETWORKS EASTERN & LONDON. Highway authority: CAMBRIDGESHIRE COUNTY COUNCIL. Traffic management: Lane closure.
DfT Street Manager Open Data
- roadworks28 Apr 2026 - 29 Apr 2026278 m
Remedial works on Footway
Remedial works (Works planned) promoted by VIRGIN MEDIA. Highway authority: CAMBRIDGESHIRE COUNTY COUNCIL. Traffic management: No carriageway incursion.
DfT Street Manager Open Data
- roadworks26 Jul 2026 - 27 Jul 2026512 m
Utility repair and maintenance works on Carriageway
Utility repair and maintenance works (Works planned) promoted by CAMBRIDGE WATER COMPANY. Highway authority: CAMBRIDGESHIRE COUNTY COUNCIL. Traffic management: Multi-way signals.
DfT Street Manager Open Data
- roadworks27 Apr 2026 - 28 Apr 2026539 m
Utility repair and maintenance works on Footway
Utility repair and maintenance works (Works in progress) promoted by CAMBRIDGE WATER COMPANY. Highway authority: CAMBRIDGESHIRE COUNTY COUNCIL. Traffic management: Give and take.
DfT Street Manager Open Data
- roadworks13 Apr 2026 - 18 May 2026482 m
Utility repair and maintenance works on Footway
Utility repair and maintenance works (Works planned) promoted by ANGLIAN WATER. Highway authority: CAMBRIDGESHIRE COUNTY COUNCIL. Traffic management: Road closure.
DfT Street Manager Open Data
- roadworks30 Apr 2026 - 5 May 2026454 m
New service connection on Footway
New service connection (Works planned) promoted by BT. Highway authority: CAMBRIDGESHIRE COUNTY COUNCIL. Traffic management: Some carriageway incursion.
DfT Street Manager Open Data